RQKV-SDUS

RQKV

a 50 Ohm resistance coax cable

RQRK

No, they are not compatible.

RREN

evacuation slide

RRLK

Abeam is defined as A on the figure

RRRD

At the gangway.

RRRG

Plan for safety preparedness

RRWD

Using sinking agents

RRYQ

Yes

RSFL

Collect rain water

RSHB

The vessel is proceeding at 7 knots or more, is more than 12 miles off land and is in a water depth of 25 metres or more.

RSSX

Stop the engine immediately and keep the lube oil pump running for at least 20 minutes before opening the crankcase

RTLE

After use

RTMY

Radiation burns.

RTOK

Both master and shipping company.

RTPF

Ask your superior for advise before attempting to operate it.

RTQE

Extinguishing attempt is started immediately

RTTQ

Inform the master

RUEJ

Check for proper air vent of the exchanger.

RUQY

Inter-ship channel

RUTJ

Bowl opens unintentionally during operation.

RUYL

Disposed of in an ashtray and ensuring that it is extinguished.

RVAV

F1B

RVBW

Yes, freon reacts with open flame to a poisonous gas (Fosgen).

RVED

Closing must be possible from outside the spaces being ventilated

RVGU

Start engine

RVHM

Forward is given by C on the figure

RVYE

Making the complete crane move fore and aft.

RWGN

per minute or parts of it

RWGX

To prevent forming a potential flammable gas cloud

RWKT

Yes, transit passage through US waters to a non US port

RWUV

He should take the padlock inside the room.

RWWQ

It depends on the installation

RXCL

Put the rudder 10 degrees to starboard

RXFR

liferaft

RXKT

This is firezones which can be divided from eachother with firedoors. If a fire start in one zone, all firedoors in front and aft of the fire will be closed from the bridge to stop the smoke and fire from spreading.

RXOA

every week

RXRE

Give a kick ahead

RXRM

First wash and then rinse with fresh water from hose.

RXRO

Activate bridge watchkeeping receivers and attract the attention of the person on watch.

RXRQ

Stop pumps  —  report  —  clean up?

RXTB

one buoyant rescue quoit, attached to not less than 30m of buoyant line

RXTW

Because these metals have a very low thermal expantion coefficient and do not burst of extreme low temperatures

RXWG

Increased turbocharger revolutions.

RYDF

5 %

RYJV

Legs bent, back straight, using leg muscles to lift

RYML

Activate the nearest fire alarm button and advise bridge of the location of the fire

RYMM

A calculation example showing the use of  «KG»  limitation curves.

RYNA

a searchlight which can work continuously for not less than 3hours

RYOR

Dirty scavenging air cooler on the air side

RYOX

All of these.

RYUT

the height of the aerial

RYWE

The use of all survival equipment

RYYY

4,50 m

SAGM

Disposed of in an ashtray, ensuring that it is extinguished

SAGQ

the frequency chosen

SAHK

The ship’s safety plan

SAHL

Stern line is given by A on the figure

SAHM

To avoid liquid coming back to the compressor during start up.

SAHN

Separation of two insoluble liquids with different densities, and at the same time removing of solids.

SAMO

Yes, if engaged by the owner.

SAOD

20 Nautical Miles

SAPX

The employer.

SBBT

The boiler be allowed to cool down by its own after shut down. Then pump the water out.

SBCL

Figure 1.

SBCM

In J3E mode — on simplex basis

SBGQ

Impossible to say

SBMI

STCW deals with minimum recommendation of education for seafarers and minimum standards for training centre and schools

SBVR

only necessary radio conversations are made in a concise and businesslike way

SBVS

Due to suction, the two ships will be sucked together

SBXE

Sitting on a chair, leaning forward, with two fingers pressing the nose together

SBXF

The governor

SBXY

Swing the load in the direction of the signal man’s face

SCBL

Class1

SCCH

Every 6 months

SCDY

13

SCJU

Turbocharger

SCPN

1000 000 000 Hz

SCQR

Activate the alarm, evacuate the area and seal the place, then activate the extinction system

SCUT

The regulations are a part of the Norwegian Ship Control Legislation regulations, concerning production and serving of foodstuffs.

SCXB

Sound the fire alarm signal

SDDX

Reduced heat capacity of the heater

SDOU

Wire takes 95 % of the extra load. Rope takes 5 % of the extra load

SDPN

SOLAS

SDPO

3.5 to 4.5 mtrs.

SDSA

Air, Breathing, Circulation.

SDUS

2 on new-builds only. Old ships have to comply by August -95

Добавить комментарий

Ваш адрес email не будет опубликован. Обязательные поля помечены *

*